Power manager 2 serial

broken image
broken image

Through the use of a HUB, your system is completely coordinated and managed by the MATE. Interconnection cabling is standard Ethernet CAT5 with RJ45 modular jacks. The OutBack HUB communicates stacking, load share and power save on/off signals. Switch case, will not working because both the approvers in Step 4 have to respond before the next condition is met. The HUB system communications manager is the backbone of your networked OutBack power conversion system.

broken image

Once I add a Condition to the flow I don't get the option for parallel branches parallel branches, but the issue is that step 4 will not start until after the condition in step 3 is True. Question: If I put 2 people in 'Assigned to:' on the 'Start an Approval' action, will it make them each an approval to review and respond to, or is it just one, and once one responds the 'Approval' is set to whatever that first person picked?

broken image

Action: Start approval process with 2 OTHER approvers.īoth of these approvers have to approve or reject before notify the submitter and move the file to an 'Approved' folder (since we can't update metadata in document library via flow). Action: approval process starts, assigned to 1 approverĤ. UPS management, graceful shutdown, and energy management software for servers and workstations using dedicated serial or USB connections. Trigger: Document uploaded to SharePoint libraryĢ.